Our Project

40 MW Upper Chameliya Hydropower Project

Project Description

  • Location: Kathmandu
  • Project Area: 2000 SQF
  • Year Completed: 2025 (ongoing)
  • Value: NPR 2500000000
  • Contract ID: Contract ID *

Project Overview

The commercial complex in Balkhu is conceived as a multi-storey retail and office building located in a strategic, well-connected zone of the Kathmandu Valley. It carries the ambition to serve as a modern business hub, combining retail showrooms, office spaces, and supporting amenities like parking, lifts, and building services. With land values in the area rising and access roads improving, such a project in Balkhu positions itself to tap into both local commerce and office tenancy demand.

Gwallek Nirman Sewa Pvt. Ltd. is responsible for the civil construction works of the Commercial Complex Project in Balkhu, including the structural RCC framework, foundation works, basement and ground-level parking facilities, multi-storey superstructure, elevator and staircase shafts, and internal and external finishing works.

Key Features

    • Multi-storey building with retail and office spaces
    • Basement & ground parking with smooth circulation
    • Modern RCC structure with high-speed elevators
    • Glass façade and premium finishes
    • Integrated HVAC, fire-safety, and utility systems
    • Sustainable design minimizing environmental impact
    • Prime Balkhu location with excellent connectivity

Technical Specifications

The commercial complex in Balkhu is being constructed with a reinforced RCC structural framework designed to meet modern seismic safety standards. The building includes deep foundation works, multi-level superstructure, and basement parking facilities to optimize land use. High-capacity elevators, mechanical ventilation systems, advanced fire-safety and sprinkler installations, electrical and plumbing systems, and adequate utility infrastructure are integrated to support commercial operations. 

Environmental Impact

The project follows environmentally responsible construction practices aimed at minimizing disruption to the surrounding urban environment. Efficient waste segregation and disposal systems are implemented to control construction waste, while proper dust suppression methods and sound management practices reduce adverse impacts on nearby residents and businesses.

Client Testimonial

Client
Rajesh Sharma

Project Director, DWSSM

"Gwallek Nirman Sewa has demonstrated exceptional professionalism in executing the Middle Chameliyya Hydropower Project. Their technical expertise in challenging terrain and commitment to quality standards has been impressive. Despite difficult working conditions in Darchula, they've maintained excellent progress while ensuring safety and environmental compliance."