Our Project

40 MW Upper Chameliya Hydropower Project

Project Description

  • Location: Seti River, Riyal
  • Project Area: Seti River, Riyal
  • Year Completed: 2026 (completed)
  • Value: NPR 0
  • Contract ID: 12312

Project Overview

The steel truss bridge over the Seti River at Riyal is a motorable bridge designed to improve regional connectivity. It links nearby rural areas to road networks, facilitating transportation, trade, and access to services. Like other bridges in Nepal, it plays a key role in socio-economic development and mobility.

Key Features

    • High strength-to-weight ratio
    • Prefabricated steel components for faster construction
    • Suitable for difficult terrains like river valleys
    • Durable and adaptable design
    • Efficient load distribution through truss geometry

Technical Specifications

  • Type: Steel truss bridge (through or deck type)
  • Structure: Triangular steel members forming a rigid framework
  • Length: Approx. 100–155 m (based on similar Seti River projects)
  • Width: Around 8–9.5 m (two-lane vehicle capacity)
  • Foundation: Pile or deep foundation system
  • Material: Structural steel trusses with concrete deck
  • Load Capacity: Designed for vehicular traffic including light and medium loads

Environmental Impact

  • Reduces travel time and fuel consumption
  • Improves access to education, healthcare, and markets
  • Minimizes risky river crossings

Client Testimonial

Client
Rajesh Sharma

Project Director, DWSSM

"Gwallek Nirman Sewa has demonstrated exceptional professionalism in executing the Middle Chameliyya Hydropower Project. Their technical expertise in challenging terrain and commitment to quality standards has been impressive. Despite difficult working conditions in Darchula, they've maintained excellent progress while ensuring safety and environmental compliance."